SteelMath.COM
ANALYSIS·10 min read··Last verified

Hydrogen Ironmaking Had Two Walls. Nippon Steel Just Put a Crack in the One Nobody Was Watching

By Special Correspondent · SteelMath

Executive summary: On 4 November Nippon Steel reported that a 60-metre pilot shaft furnace at its Hasaki research centre had run for more than 300 hours on pure hydrogen and produced over 1,000 tonnes of direct reduced iron from blast-furnace-grade pellets, the ordinary 63% to 65% iron product that feeds most of the world’s furnaces, rather than the scarce 67%-plus pellets that direct reduction has always demanded. The tonnage is trivial; a single commercial module makes that much before lunch. The feedstock is not. Hydrogen ironmaking has always faced two walls: the price of hydrogen and the supply of ore good enough to reduce without a blast furnace’s forgiving slag chemistry. For a decade the industry has stared at the first wall while quietly assuming the second away. Nippon Steel’s result is the first credible evidence at pilot scale that the ore wall can be climbed with chemistry and furnace control rather than by waiting for mines that do not exist. The hydrogen wall, meanwhile, has just claimed another set of victims in Europe, where the continent’s flagship 100% hydrogen plants are delayed to 2029 or suspended outright. The two facts together redraw the map: the technology race is being won slowly in Japan and Korea, the deployment race is being won pragmatically in China with gas-hydrogen hybrids, the economics will be settled wherever hydrogen is cheapest, and the largest beneficiaries are not the companies inventing the technology but the countries sitting on ordinary ore: Australia, Brazil, India, Canada and Ukraine, whose blast-furnace-grade resources were about to be stranded by a green steel route that could not use them.

What was actually demonstrated

The facts in Nippon Steel’s release are spare. The furnace is a pilot-scale shaft about 60 metres tall with a design rate of one tonne per hour, commissioned in March 2026 under the NEDO Green Innovation Fund programme that Nippon Steel shares with JFE Steel and the Japan Research and Development Center for Metals. In the reported campaign it ran continuously for over 300 hours on 100% hydrogen and produced more than 1,000 tonnes of DRI. The feed was blast-furnace-grade pellets. Two problems that have dogged every hydrogen shaft-furnace trial were handled: the reaction is endothermic, so a furnace fed only hydrogen cools itself down and the reduction stalls, which Nippon Steel countered with what it calls thermal compensation technology; and low-grade pellets tend to disintegrate into fines as they reduce, choking gas flow, which it suppressed through operating technique. The company gives no iron grade for either pellet type, no metallisation figure and no energy balance. Scale-up development begins in FY2027 and the target for an implementable technology is around 2040.

Three things about that paragraph deserve emphasis because the commentary around the announcement has missed them. First, 2040 is not a slip; it was always the schedule. Japan’s steelmakers chose a long, state-cofunded research path and are on it. Second, the thermal problem is the easier of the two: it is an engineering question of how to put heat into a hydrogen shaft furnace, and several answers exist, from preheating the gas to electric heating of the burden. Third, the pellet problem is the one that matters for the rest of the world, because it is not an engineering question at all. It is a question about the Earth’s crust.

The wall nobody was watching

Direct reduction has run on natural gas for fifty years in Mexico, Iran, the Gulf, Russia and the United States, and in all that time it has used a narrow slice of the world’s iron ore: pellets at 67% iron or better with low silica and alumina, because what is not iron in the pellet stays in the DRI and must be melted out in an electric furnace that, unlike a blast furnace, does not want slag. About 100 Mt of DRI a year is made this way. Scaling hydrogen DRI to replace even a third of the world’s blast-furnace iron would require several hundred million tonnes of DR-grade pellets that nobody mines. Midrex, the dominant shaft-furnace licensor, projects a DR-grade pellet shortfall of 16.5 Mt by 2034; BloombergNEF puts the gap at 133 Mt by 2040. Only about 30% of today’s DR-grade supply is even sold on the open market; the rest is captive. The miners who could fix this, Vale, Rio Tinto, BHP and LKAB, face their own constraint: the high-grade deposits that beneficiate cleanly to DR grade are a small and shrinking share of what they dig, and Pilbara ore, the largest single source of iron units on earth, is not among them.

Two workarounds have emerged, and Nippon Steel’s result is a third. The first is to accept low-grade DRI and melt it in an electric smelting furnace that can handle slag, then feed the hot metal to a conventional converter; this is the path BHP, Rio Tinto and BlueScope are piloting in Australia and the one IEEFA’s June 2026 review judges necessary if direct reduction is to scale on Pilbara-type ores. It adds a furnace and a cost. The second is to abandon pellets and reduce fines directly in a fluidised bed, which is POSCO’s HyREX bet, now being tested on BHP ore under a collaboration signed in September. It is elegant and unproven above laboratory scale. The third, Nippon Steel’s, is to keep the shaft furnace that industry already knows how to build and operate, and make it tolerate worse pellets through heat management and burden control. If that holds at scale, the addressable ore base for hydrogen DRI widens from a few tens of millions of tonnes of premium pellets to the hundreds of millions of tonnes of blast-furnace pellets already made in India, Brazil, Ukraine, Canada and China. That is why a thousand tonnes matter.

The wall everybody is watching, and hitting

SWIPE TO SEE DATES →
OPERATINGUNDER CONSTRUCTIONDELAYEDSUSPENDEDSTART / TARGET00.511.522.5DRI CAPACITY, MT / YEARthyssenkrupp tkH2SteelDUISBURG, GERMANY2.5 MtDELAYED · GAS FIRST, H₂ LATER2029 (was 2027)ArcelorMittal GijónSPAIN2.3 MtSUSPENDED / CANCELLED · H₂-READYFID suspendedStegraBODEN, SWEDEN2.1 MtUNDER CONSTRUCTION · 100% H₂2026 target, start unconfirmedHYBRIT demonstrationGÄLLIVARE, SWEDEN1.35 MtDELAYED · 100% H₂2027+Baowu ZhanjiangCHINA1. MtOPERATING · UP TO 70% H₂since 2024POSCO HyREX demoPOHANG, KOREA0.3 MtUNDER CONSTRUCTION · 100% H₂ (FINES)2028Nippon Steel pilotHASAKI, JAPANPILOT, 1 t/h · 100% H₂, BF-grade pelletsscale-up FY2027 · 2040
The hydrogen-ready DRI pipeline, November 2026: the only plants running are a Chinese gas-hydrogen hybrid and a Japanese pilot; Europe’s 100% hydrogen flagships are delayed or suspended. Nameplate DRI capacity in million tonnes a year; status and dates as publicly stated at 9 Nov 2026. ArcelorMittal’s Dunkirk DRI (dropped for a 2029 EAF) and its two cancelled German modules are omitted as they no longer have a DRI capacity. The Nippon Steel pilot is drawn as a marker, not a bar.
Data table: hydrogen-ready direct reduction projects, status at 9 November 2026
ProjectDRI Mt/yrReductantStatusWhy it is where it is
thyssenkrupp tkH2Steel, Duisburg2.5Gas first, hydrogen share to followDelayed to 2029 from 2027; funding terms rewritten to allow a gas startNo hydrogen supply contract; a fresh tender only now being prepared
ArcelorMittal Gijón2.3Hydrogen-readyFinal investment decision suspendedCited CBAM “deficiencies” and absence of a hydrogen framework
ArcelorMittal Dunkirk, Bremen, Eisenhüttenstadt——DRI dropped (Dunkirk becomes a 2 Mt EAF in 2029); German modules cancelled€1.3bn of German subsidy declined; gas, power and hydrogen prices
Stegra, Boden2.1100% hydrogen, 700 MW electrolysisUnder construction; 2026 start still the stated target, not yet confirmedFunded (€6.5bn) and permitted; first-of-a-kind commissioning risk
HYBRIT demonstration, Gällivare1.35100% hydrogenDelayed; engineering now 2027 or laterCost and sequencing of the LKAB–SSAB system
Salzgitter SALCOS~2.1 (stage 1)Hydrogen-readyStage 1 slipped to 2027; stages 2 and 3 postponed about three yearsBoard decision of September 2025 on economics and regulation
Baowu Zhanjiang1.0Gas, coke-oven gas and up to 70% hydrogenOperating since 2024; Pilbara ore trials with BHP and Rio TintoFuel-flexible design that did not wait for green hydrogen
POSCO HyREX, Pohang0.3 demo100% hydrogen, fluidised bed on finesDemonstration plant due 2028; commercial-ready target 2030State-backed “Steel GX” cluster; BHP ore agreement Sept 2026
Nippon Steel, Hasaki0.008 pilot100% hydrogen, BF-grade pelletsOperating since March 2026; 300 h, 1,000 tScale-up from FY2027; implementation around 2040

Read the status column top to bottom and a pattern appears that no single headline conveys. Every European project designed around 100% green hydrogen is late or stopped. The one large plant actually making hydrogen-reduced iron is Chinese, was engineered to run on whatever gas is cheapest, and treats hydrogen as a dial rather than a destination. The two projects most likely to produce genuinely new technology are Japanese and Korean, state-cofunded, and scheduled for the late 2030s. Europe’s problem was never the chemistry. Thyssenkrupp’s Duisburg tower is being erected on schedule; what is missing is anyone willing to sell it hydrogen at a price that makes the steel sellable. European green hydrogen was quoted at roughly $7 a kilogram this year against the €2.50 to €3 that steelmakers say they need. ArcelorMittal walked away from €1.3 billion of German subsidies rather than commit to that gap, and the state has been stepping in to carry what private balance sheets will not.

The reductant-parity price

The cleanest way to see when hydrogen ironmaking becomes a business rather than a programme is to compare what each route pays for its reductant, because that is where the two routes differ most and where policy can least disguise the gap. A hydrogen shaft furnace needs roughly 55 to 60 kilograms of hydrogen per tonne of DRI once gas recycling is accounted for. A blast furnace consumes between three-quarters of a tonne and a full tonne of metallurgical coal per tonne of hot metal depending on coke quality and injection practice; the upper end is typical of high-ash blends, as this week’s analysis of India’s coking coal position sets out, and that coal lands at $230 to $290 a tonne depending on grade. Divide the coal bill by the hydrogen requirement and the arithmetic gives a reductant-parity price of about $3.50 to $4.50 a kilogram: below that, hydrogen is the cheaper reductant per tonne of iron before anyone counts carbon, capital or electricity.

That number is both encouraging and sobering. Encouraging, because the cheapest hydrogen in the world is already near the line. The Gulf, with record-low solar tariffs, is quoted near $3.20 a kilogram. India’s auctions under its SIGHT scheme have discovered about ₹397 a kilogram, roughly $4.70, and a Berkeley study published in May models $3 as achievable there and full cost parity with blast-furnace steel at about $2.50 for plants commissioned around 2030. Chinese electrolyser costs, already a fraction of Western prices, push the same way. Sobering, because reductant parity is only the first hurdle: the DRI must then be melted in an electric furnace at industrial power prices, the plant must be built at first-of-a-kind capital cost, and the hydrogen must be delivered continuously to a furnace that cannot wait for the sun. Europe, at $7 hydrogen and €80-plus power, clears none of these; a Gulf or Indian plant at $3 hydrogen would clear the first and still have to prove the other two.

Carbon pricing moves the parity point. At the EU’s current certificate price of about €82 per tonne of CO₂, the roughly 1.5 tonnes of CO₂ per tonne of steel that separates a blast furnace from a hydrogen DRI-EAF route is worth around €120 a tonne of steel once CBAM reaches full strength in 2034, which, spread over 60 kilograms of hydrogen, is equivalent to a subsidy of about $2.30 a kilogram for steel sold into Europe. Exporters can test their own numbers in the CBAM calculator. The point is not that CBAM alone closes the gap; it is that a market with CBAM and $3 hydrogen is a market where hydrogen DRI pencils out, and a market with CBAM and $7 hydrogen is a market where steelmakers, rationally, build electric furnaces and import the iron.

Five strategies, one technology

Japan: the patient incumbent. Nippon Steel is pursuing three breakthroughs in parallel under its 2050 vision: high-grade steel from large electric furnaces, hydrogen injection into blast furnaces, and hydrogen DRI. The hydrogen blast furnace, Super COURSE50, has reported about a third less CO₂ in a test furnace with heated hydrogen and is being readied for a commercial furnace at Kimitsu. The company’s strategy is to keep its blast furnaces running cleaner for two decades while the DRI route matures to 2040, and to use the time and its US acquisition to fund it. This is coherent. It is also only available to a company with Japan’s cost of capital and the Green Innovation Fund behind it.

China: the pragmatic deployer. Baowu did not wait. Its 1 Mt Zhanjiang plant runs on a mixture of natural gas, coke-oven gas and hydrogen up to 70%, produced 21,620 tonnes at 94% metallisation in its performance test, and has completed commercial-scale trials with BHP’s Pilbara ore and Rio Tinto’s, with the DRI largely charged into existing converters. Half the emissions of a blast furnace, today, on ordinary ore, with no dependence on a hydrogen market that does not exist. China is treating the shaft furnace as a flexible asset whose carbon intensity falls as hydrogen gets cheaper, which is how a capital-rich, policy-directed system learns by doing.

Korea: the technology gambler. POSCO’s HyREX skips pellets entirely, reducing fines in fluidised beds and melting in an electric smelter. If it works it solves the ore problem more completely than any shaft-furnace variant and uses the cheapest iron units on earth. The 300,000-tonne demonstration plant is due in 2028 inside a state-backed decarbonisation cluster stretching from Pohang to Gwangyang, and POSCO has said that profits from its overseas growth, including its Indian joint venture with JSW, are meant to pay for it.

The Gulf: the resource owner. Saudi Arabia, the UAE and Oman already run the world’s largest fleet of gas-based DRI, have the cheapest solar electricity on record and are building the Ras Al Khair DRI-EAF complex with Baowu, Aramco and PIF. They will not invent hydrogen ironmaking; they will own the place where it is cheapest to do. Every European steelmaker that drops a DRI module and keeps an EAF is implicitly planning to buy Gulf iron.

Europe: the policy builder. Europe wrote the carbon price that makes all of this bankable and then discovered that a carbon price cannot conjure hydrogen. Its retreat is not a verdict on the technology; it is a verdict on the sequencing of its own policy, which priced carbon before it built the electricity and electrolyser base to supply the alternative. The transition scorecards that rank European producers highest are measuring intention, and intention has just met the hydrogen price.

Who gains: the owners of ordinary ore

A green steel route that needs 67% pellets concentrates advantage in a handful of places: LKAB’s Swedish magnetite, parts of Brazil’s Minas Gerais and Carajás, Canada’s Labrador Trough, a few captive pellet plants in the Gulf and the United States. Everyone else would have to import iron units to decarbonise. A route that tolerates ordinary blast-furnace pellets reverses that geography. Australia, which ships the largest volume of iron ore on earth from Pilbara deposits that do not beneficiate to DR grade, has spent three years and a great deal of money on electric smelting furnace pilots precisely because its ore was about to be locked out of the hydrogen route; a tolerant shaft furnace is a second door. Brazil’s Vale, the world’s largest pellet producer, sells most of its output as blast-furnace pellets and has been signing partnerships in the Gulf to add value to them; the addressable market for those pellets just widened. India is the sharpest case: the world’s largest DRI producer at around 55 Mt a year, almost all of it from coal-fired rotary kilns that are the most carbon-intensive iron on earth, with ore of 62% to 65% iron and stubborn alumina, and roughly 100 Mt a year of pellet capacity almost entirely at blast-furnace grade. It has the deepest reservoir of DRI operating skill anywhere and the largest installed base of electric steelmaking, and until last week the hydrogen route was one it would have had to import ore to run. China, which processes vast tonnages of low-grade domestic ore, and the pellet exporters of Ukraine and Canada sit in the same camp.

For all of them the constraint is now hydrogen and power rather than ore. Australia has the renewable resource and the ore but has so far framed its ambition as exporting green iron rather than making steel. Brazil has hydro-powered grids and pellets but little electrolyser capacity. India illustrates how far the hydrogen leg lags the ore leg: it had commissioned only about 8,000 tonnes a year of green hydrogen by February against a 2030 target of five million tonnes; its steel ministry has ₹455 crore, around $55 million, allocated for steel pilots through FY30, a rounding error against a single DRI module; JSW’s Vijayanagar pilot feeds 3,800 tonnes of hydrogen a year, enough to reduce perhaps 60,000 tonnes of iron, into an existing DRI unit; Tata Steel and SAIL are injecting hydrogen into blast furnaces for single-digit emission cuts. These are sensible experiments, and in every ore-rich country they are experiments rather than strategies.

A strategy would read differently, and it would read the same in Perth, Belo Horizonte and Mumbai. Build the next generation of gas-based shaft furnaces hydrogen-ready and fuel-flexible, on the Baowu model, at coastal sites where LNG and future hydrogen land, and run them on blended gas while the hydrogen price falls. Treat pelletisation and beneficiation as strategic infrastructure, because the ore tolerance Nippon Steel demonstrated still requires pellets, not fines, and the pellet industries of the ore-rich world are export-oriented and capital-starved. Pair direct reduction with electric smelting furnaces where the ore is too poor even for a tolerant shaft, as IEEFA recommends, so that scarce scrap is not the only clean metallic available in growth markets. And recognise that a reductant-parity price of about $4 a kilogram is already within sight of the cheapest auctions, which means the question is no longer whether hydrogen DRI can work on ordinary ore but who builds the first hydrogen-ready module and where its power comes from. The ore-rich have the ore, and in India’s case the DRI skills and the electric furnaces as well. What they lack is the one thing Europe also lacks, and the one thing the Gulf has.

What to watch

Six markers will tell you whether this analysis is right. Stegra’s first hydrogen DRI at Boden, which would be the world’s first 100% hydrogen production at commercial scale and is now the single most important data point in green steel. Thyssenkrupp’s annual report on 8 December and whatever it says about hydrogen supply for Duisburg. Nippon Steel’s FY2027 scale-up design, specifically the module size it chooses and whether it publishes metallisation and energy figures. POSCO’s HyREX demonstration in 2028. The first order for a hydrogen-ready shaft furnace, rather than a pilot, by a producer in an ore-rich country, whether in India, Brazil or Australia. And the prices discovered in the next hydrogen auctions in the Gulf and India, measured against $4 a kilogram.

The honest limits

Nippon Steel disclosed no metallisation, energy consumption or pellet chemistry, so the quality of the DRI and the cost of the thermal compensation are unknown; a tolerant furnace that makes poor DRI slowly is not a breakthrough. The reductant-parity calculation compares reductant costs only and ignores capital, electricity, labour and the value of blast-furnace by-products; it is a threshold, not a business case. Hydrogen requirements per tonne vary with ore, metallisation target and recycling design. Project statuses are as publicly reported and several, notably Stegra and SALCOS, rest on company guidance that has moved before. None of these caveats alters the direction of the argument; each should temper confidence in any single number in it.

Frequently Asked Questions

What did Nippon Steel achieve with hydrogen DRI?

At its Hasaki R&D centre, a 60-metre pilot shaft furnace rated at one tonne per hour ran for more than 300 hours on 100% hydrogen and produced over 1,000 tonnes of direct reduced iron from blast-furnace-grade pellets rather than the high-grade DR pellets normally required. The company reports solving the furnace-cooling problem of hydrogen reduction with thermal compensation technology and suppressing pellet powdering through operating technique. Scale-up work begins in FY2027 with implementation targeted around 2040.

Why is using blast-furnace-grade pellets significant?

Direct reduction has historically needed pellets of 67% iron or more, a scarce product with a projected shortfall of 16.5 Mt by 2034 (Midrex) to 133 Mt by 2040 (BloombergNEF). Blast-furnace-grade pellets at 63% to 65% iron are produced in the hundreds of millions of tonnes in Brazil, India, China, Canada and Ukraine, and most of the world’s iron ore, including Australia’s Pilbara output, can only ever reach that grade. A hydrogen DRI process that tolerates such pellets widens the ore base for green steel dramatically.

Why are Europe’s hydrogen steel projects delayed?

Hydrogen price, not technology. European green hydrogen has been quoted near $7 a kilogram against the €2.50 to €3 steelmakers say they need. Thyssenkrupp has pushed its Duisburg DRI plant to 2029 and may start it on natural gas; ArcelorMittal suspended its Gijón decision and dropped DRI at Dunkirk and in Germany; HYBRIT and Salzgitter have slipped. Stegra in Sweden remains the key 100% hydrogen project to watch.

What is the reductant-parity price for hydrogen in steelmaking?

Roughly $3.50 to $4.50 a kilogram. It is the hydrogen price at which 55 to 60 kg of hydrogen per tonne of DRI costs the same as the 0.75 to 1 tonne of metallurgical coal, at $230 to $290 landed, that a blast furnace uses per tonne of hot metal. Below it, hydrogen is the cheaper reductant before carbon pricing, capital or electricity are considered. Gulf hydrogen is quoted near $3.20, Indian auctions near $4.70 and European supply near $7.

Which countries gain most from ore-tolerant hydrogen DRI?

Those with large blast-furnace-grade resources that a 67%-pellet route would have stranded: Australia’s Pilbara producers, Brazil’s pellet makers, India (the world’s largest DRI producer at about 55 Mt a year, almost all coal-based, with 62% to 65% iron ore), China’s low-grade domestic miners and the pellet exporters of Canada and Ukraine. Their binding constraint shifts from ore to hydrogen and power: Gulf hydrogen near $3.20 a kilogram and Indian auctions near $4.70 are close to the reductant-parity threshold, Europe at about $7 is not.

Is Baowu’s Zhanjiang plant a hydrogen DRI plant?

It is a 1 Mt fuel-flexible direct reduction plant that can run on natural gas, coke-oven gas and hydrogen in any mix up to about 70% hydrogen, operating since 2024. It has completed commercial-scale trials on BHP and Rio Tinto Pilbara ores with roughly half the CO₂ intensity of blast-furnace hot metal, making it the largest hydrogen-using DRI plant in operation today.